Client: EastBanc
Location: Washington DC
Scope: 156,000-sf 8-floor building, ongoing since June 2022
Objectives
- Demonstrate controlled and safe indoor air quality post-COVID to reassure tenants.
- Address tenant complaints regarding uncomfortable air conditions, including overheating and stuffiness.
Solution
- Implemented an IAQ monitoring system across all floors to provide real-time data, making air quality information publicly accessible to build tenant trust.
- Installed an outdoor AQ monitor to validate the superior indoor air quality.
- Set up a public display in the lobby to provide visible and continuous air quality updates.
Results
- Improved tenant retention rates and increased building occupancy.
- Significantly reduced tenant complaints about air quality.
- Provided building engineers and administrators with immediate alerts on air quality issues, enabling proactive management and resolution before tenant discomfort arises.